DStv · Cape Town

Planning satellite cabling before the walls close

There is a short window during a build or a renovation when cable can go anywhere you like. It closes when the plaster goes on, and everything afterwards is a compromise.

Conduit and coaxial cable installed in an unplastered brick wall

We get two versions of this call. One is from somebody whose house is a shell with the roof on, asking what should go in before the plasterers arrive. The other is from somebody who moved into a finished new house eight months ago and now wants a point in a bedroom that has no route to it. The first call takes an hour of planning and saves a great deal of work. The second one is why we wrote this page.

The window while the walls are open

In a new build, the cost of running satellite cable is almost entirely labour, and that labour is trivial while the ceilings are open and the walls are unplastered. Conduit and cable pulled at that stage disappear into the structure. The same run added later means lifting ceilings, chasing walls, patching, and painting a room that was already finished.

So the useful instruction to give your builder is simple: run conduit to every position that might ever want a television, whether or not there is a decoder planned for it. Spare runs that are never used cost very little. Missing runs cost a room's worth of making good.

The rooms worth cabling

  • Lounge or family room — the obvious one, usually with two positions considered so the furniture can change
  • Main bedroom, and any bedroom that might become a study or a teenager's room
  • Patio, braai area or covered outdoor room, which is easier to plan now than to add later
  • A cottage, flatlet or garage conversion, even if it is not being built out yet
  • The position where the equipment will live, with a run back from it to the dish entry point

That last one is the part most people leave out. Decide early where decoders will sit, and make sure there is a route from there to where the dish will be and to every viewing point. A tidy installation has a centre; an untidy one has cable radiating from wherever the first decoder happened to end up.

Choosing the dish position off the plan

The dish needs a clear line of sight, and on a building site that is a question about what has not been built yet as much as what has. The neighbouring stand may be vacant today and carrying a double storey in two years. Trees planted as part of the landscaping will be considerably taller within a decade. We look at the site with both of those in mind rather than only at what is currently in the way.

Where the dish goes then determines where the cable enters the building, and that entry point wants to be decided while somebody can still make a neat hole in an unfinished wall. Entry through a fascia or a soffit into the roof space is usually cleanest. The mounting itself — wall, gable or pole, and what to fix into — is covered on our dish installation page.

Worth agreeing with the builder before plaster

Four small decisions that are easy now and awkward later.

  • Where the cable enters the roof space or the wall, and who makes that opening
  • Whether conduit is being run, and to which positions
  • Where the boxes for wall points sit, and at what height on each wall
  • Which wall the dish bracket will fix to, so the structure behind it is solid

What to leave in the wall if nothing is being installed yet

Plenty of people are building now and will sort out television later, or are letting the house out and do not want to decide for a tenant. That is fine. The point is not to install a system early, it is to leave the routes.

Conduit with a draw wire in it, terminating in a box at each position, is all that is needed. Cable can be pulled through whenever the decision is made, and it can be replaced years later without touching a wall. If cable is being pulled at build stage, we leave a generous tail coiled in each box rather than cutting to length — a metre of spare cable is what allows a point to be moved or a plate to be re-terminated without a re-run. That standard is set out on cabling and TV points.

Renovations and older houses being re-wired

A renovation gives you a partial version of the same window, and it is worth using. If ceilings are coming down in half the house, that half can be cabled properly at no real extra effort. If a room is being re-plastered, its points can be put where they should be rather than where the old ones happened to land.

Older Cape Town houses have their own quirks. Solid walls with no cavity, ceilings that do not connect across added-on wings, and roof spaces that stop at an internal wall are all normal here, and they are exactly the conditions that make a later addition difficult. Finding those obstacles while the ceiling is already open is far better than finding them with a customer standing in a finished lounge.

This is also the moment to think about how many points the finished house will run, because that decides the equipment at the dish end rather than the other way round. On a freestanding house that usually means a Smart LNB, which MultiChoice recommends for single-unit dwellings and which distributes multiple satellite signals down a single cable. In a complex it does not apply, and complexes and apartments explains why.

How we work with builders and electricians

  1. A site visit at first fix

    Before the plasterers, ideally while the electrician is still on site. We mark positions and agree routes with whoever is doing the chasing.

  2. Conduit and boxes in, cable pulled or drawn later

    Either we pull cable at that stage or we leave draw wires so it can be pulled when the house is finished. Both work; the choice is usually about timing on site.

  3. Dish position confirmed against the finished structure

    Once the roof and any upper storeys are up, the line of sight can be checked properly rather than estimated from a plan.

  4. Second visit to fit plates and commission

    Plates, dish, LNB and connections when the walls are painted, so nothing we fit is damaged by the trades still working.

New developments in Parklands and along the West Coast, and the complexes going up around Brackenfell, make up a good deal of this work. Where a developer has already cabled the units, we work with what is there — and if it turns out the runs are not where they should be, it is better to know that at handover than a year in. The general approach across the metro is on our DStv installation page.

Questions we get asked

At what stage of the build should I get you in?
First fix, before plastering, and ideally while the electrician is still working. That is when routes can still go anywhere. A visit at that stage is short and it prevents almost every problem people phone us about after moving in.
Do I have to install the whole system during the build?
No, and often it makes no sense to. Leaving conduit with a draw wire to each position is enough. The cable and the equipment can be installed whenever you are ready, without anybody touching a finished wall.
Can my electrician run the coax while doing the wiring?
They can, and many do. It helps if the positions and the routes are agreed first, and if the cable being used is suitable for satellite rather than whatever offcut is on the van. We are happy to specify what should go in and then commission it afterwards.
The house is finished and there is no cable to the bedroom. What are my options?
It depends on the construction. If there is an accessible roof space above that room, a run down an internal wall is usually possible with minimal disruption. If not, the options are a bulkhead route, trunking or a discreet external run, and we will show you what each will look like before you decide.
Should the dish go up before the landscaping is done?
Position it with the landscaping in mind either way. Trees that are knee-high at handover become the reason a signal fails ten years later, and moving a dish afterwards is a bigger job than choosing a better position now.
Our developer already cabled the units. Is that usually enough?
Sometimes it is entirely adequate and sometimes the runs are in the wrong places or terminate somewhere inconvenient. We test what is there before adding anything, and if it is sound we use it. There is no sense pulling new cable alongside cable that works.

Get it sorted

Book a technician

Tell us the make, the size and what the screen or decoder is doing. We will give you a time slot and a quote before anyone starts work.

218 Thornton Road
Thornton, Cape Town
info@capetvrepairs.co.za